Products

Move the air conditioning machines

Move the air conditioning machines

&Nbsp;   air conditioning move steps: first, the preparations: at least two people, or two or more skilled refrigeration mechanic, tool set, seat belts and other safety equipment. Second, steps to disassemble: 1. Recovery of refrigerant, either in winter, or summer transfer, you must collect the refrigerant in the air conditioner outdoor unit to teardown should be started before air conditioning, refrigeration available set, compressor running cooling correctly, immediately close the high and low pressure valves, quick shutdown, unplug the power plug. 2. Remove indoor unit indoor unit hanging plate 3. Split outdoor unit (note this link below, as well as a car and other items) 4. Teardown work Beijing air conditioning machine free shipping. Reinstall of the three, air conditioner 1. According to Hefei air conditioning move client installation requirements, the external position, set the indoor unit hanging plate, installing the indoor unit. 2. Install outdoor unit 3. Connect the indoor and outdoor pipe and connected to the power supply, drains and the line of control in the air. 4. Fully open the high and low pressure valve, detergent leak, if no bubbles come out running to boot. 5. Air conditioning refrigeration effect is not normal operation, the indoor unit air outlet temperature does not meet the requirements, taking into account additional refrigerant. 6. Refrigerant charge complete, end all this moving work.
BACK